Give your builder one record of changing equipment choices
A decision sheet helps the owner and project team track how a new choice affects layout and installation.
This article is sponsored by Harrison Construction. Partner content policy
Commercial tenants can change their equipment choices several times before drawings are ready. Start a decision sheet for the items that may affect the space, such as display fixtures, refrigeration and back-room equipment. Pick one owner for the sheet so everyone knows which version to use.
Separate selected items from placeholders
Record the model or description, who supplies it and which document the design team should review. Put approximate dimensions and unconfirmed models in a clearly labeled column. If the item changes, record the date and ask the responsible design or construction professional which parts of the drawing or estimate need another look.
A useful example is a checkout counter the tenant plans to supply. Note whether it is an existing fixture or new equipment, where it may be placed and who will confirm the exact dimensions. Ask the team to identify who needs that answer before making a dependent decision.
Bring open items into preconstruction
Harrison Construction lists estimating and project planning in its preconstruction service. At a preconstruction meeting, ask the builder to identify the drawings, quotes or schedule items tied to the incomplete choices. Leave with an owner and follow-up date for the next decision that affects other work.